Contact Us
Wuxi Jinye Complete Set of Equipment Co.,Ltd
Add: Wuxi City, Jiangsu Province, Umemura Industrial Park Road 9 Zhang Road
Contact: Yan Yanjun
Tel: +86-510-81819377
Mob: +86-18951513765
Fax: +86-510-88159195
E-mail: globalsales2013@gmail.com

3-12 X 2000 Heavy Duty Cut to Length Line

3-12 x 2000 Heavy Duty Cut to Length Line introduction We supplied 10 sets heavy duty cut to length lines to overall world market, we know well the material properties of steel plates in different countries and regions, so we can design and make the most suitable smooth leveling and cut to...

3-12 x 2000 Heavy Duty Cut to Length Line introduction

We supplied 10 sets heavy duty cut to length lines to overall world market, we know well the material properties of steel plates in different countries and regions, so we can design and make the most suitable smooth leveling and cut to length line.

The most popular model of heavy duty cut to length lines is JY(3-12)x2000, we supplied the machine line to Saudi Arabia, Jordan, Algeria.

Input steel coil material

HR normal carbon steel series such as Q195, Q235, Q345etc.

Technical properties: yield strength ≤350Mpa Tensile strength≤550Mpa

Thickness of coils: 3-12mm

Coil width: 600-2000mm

Outer diameter of coils: Φ2100mm(Max)

Inner diameter of coils: Φ480-800mm

Coil weight: 30T max

Output finished thick plates

Cutting Length: 2000mm—12000mm

Cutting style: hydraulic stop shear

Line speed: max 20m/min, 6m length two pieces per minute

Precision in length: ≤±1.0mm/m

Precision in diagonal length: ≤±1.5mm/m

Leveling precision: ≤2-2.5mm/m2

Capacity of the heavy duty cut to length line

Total installation power: about 300KW

Land occupation: about 35m length, 10m width

Work Flow of the Cut To Length Line

Option 1: 

Coil loading car----Decoiler----coil head press, guide and shovel equipment----Double roller pinch feeder and three roller straightener----Transmission roll table----Central aligner----11 roller leveler----encoder----Final plate sender----cut to length shear ----plates-delivering roll table----plates sending out device----plates supporting platform plus plates piling up device

Option 2: 

Coil loading car----Decoiler----coil head press, guide and shovel equipment----Double roller pinch feeder and Five roller pre-leveler----Transmission roll table----Central aligner----13 roller leveler----encoder----Final plate sender----cut to length shear---- plates-delivering roll table----plates sending out device----automatic stacking system (include plates receiving roller arms bracket, hydraulic lifting table, plates piling up device and output roll table)

Other equipment

hydraulic station, DC motor electric control cabinet, electric control consoles.

37.jpg

Our service

Ø  Provide the technical design and solutions;

Ø  New plant construction guidance;

Ø  Designing and manufacturing of non-standard equipment;

Ø  Professional technical training and guidance on site according to the contract;

Ø  Supply accessories at any time;

Ø  Tele-technical consulting and services;

Ø  Other special technical service according to client’s requirements.

39.jpg

FAQ

1.Which level of quality are your products?

A: We don’t say our machine quality is the best, our aim is to supply most suitable machine at most reasonable price. “functional, safe, economical” principles keep our company everlasting.

2.What is the delivery time of your machine?

A: The machine design and production need a production cycle. For small machine, usually 45-60days. For big machine and production line, usually 90days - 120days.

3.As the shipping period will take long time, how can you make sure the machine won’t be broken?

A: Our machine is film wrapped, to make sure the machine can be delivered to our customer in safe conditions, we fix the machine in the container by steel wires / ropes.

4.May I know What payment terms is accepted by your company?

A: So far, (30% advance + 70% balance) 100% T/T before shipment, or 30% deposit by T/T and balance by L/C.

5.About the after-sale service, how can you solve the problems occurred of your overseas customer in time?

A: The warranty period of our machine is 12 months. Within the period, if machine problem is due to quality fault, we will replace parts for free. The moment we know the machine problem from customer, we will firstly tell the customer the fastest available schedule, then bring solution or send out parts as scheduled.


Inquiry